Building My Workshop Part 9

Monday, January 30, 2012

Originally posted on Shopsmith Forums on 1/16/2012

Beautiful weather and a three day weekend!

Had my 21-year high school reunion Friday night so we stayed the night at my parents. That gave me a late start Saturday, but I did manage to get a lot of the wiring done. I got my new breaker box mounted and the feed wires connected and got the lights wired. Like I said I would do, I put outlets on the ceiling to plug the lights in to. That was all the daylight I had.

Today I wired as many outlets as I could before I ran out of wire. Then I tied the electrical in to the breaker box on my utility pole. That pole has the meter and under that is a big breaker box and from there it feeds the house and the AC unit on different circuits. I put in a double 50amp breaker in that box for the shop.



Also as I mentioned (I think in the first post of this thread) I'm using the breaker as the light switch. I was concerned about doing that after JPG's warning. But I had also asked what the SWD stamped on my breakers meant. I've since learned that means the breaker is rated for switching duty, so I stuck with my plan.

Then I got everything cleaned up again and almost got everything moved from the 8"x10" storage shed to the shop. I'm off tomorrow and will finish moving things over, finalize some layout ideas, and hopefully start building some shelves and getting things arranged.

I brought back this old wood burning stove from my dad's. I was thinking I might use it to get through this winter, but at this point I'm no sure it will be necessary. It just hasn't been cold enough. But I think I might do a full restoration on it before I give it back to him. He might could use it in one of his shop extensions.



I have a lot of sentimental value in this stove. Dad got it when I was a kid (and it was old then) to heat our house. We were quite poor, living in a little trailer house. Someone we went to church with gave it to my dad. I helped Dad build a brick hearth to place it on. Then I spent many Saturdays out with dad cutting trees and chopping wood for the winter. And many cold winter nights enjoying the results of that hard work.

Building My Workshop Part 8

Originally posted on Shopsmith Forums on 1/10/2012

It rained pretty heavy yesterday and last night, so that gave me the chance to check my roof for leaks. I only had 3 which wasn't as bad as I had feared. One was an old hole I completely overlooked when I was plugging them. The second was a lap screw that wasn't sealing - it probably stripped out when I put it in. The third is going to take some more investigation. The seam between two overlapping pieces of tin was wet along the whole seam. Water was running down the seam, then coming to a point where it was dripping. I've got buckets set up and have everything marked (from the inside). When everything dries I can silicone those first two and investigate the 3rd.

Building My Workshop Part 7

Originally posted on Shopsmith Forums on 1/8/12

The wife got home giving me enough daylight to get my lights hung and about 6 outlet boxes nailed to studs. I went with the cheap 48" florescent shop lights. I just like that light and absolutely hate the CFL bulbs and don't ever want to be forced to use them where I can avoid it. If I could swap out all the fixtures in my house to avoid CFLs I would do it.

The shop lights have cords with plugs instead of being directly wired. I briefly contemplated cutting the plug off and splicing them in to the wiring. But I quickly decided the smarter thing to do would be to put an outlet on the ceiling to plug them in to. And now I can at least plug one of he lights into an extension cord until I get the wiring done.

And I adjusted the floor plan at least another 6 times while I was hanging the lights.

Building My Workshop Part 6

Originally posted on Shopsmith Forums on 1/2/2012

I forgot to mention that I did add 6 more blocks along each side. Treated lumber cutoffs on concrete pads. I used my motorcycle jack to lift the building a hair at each blocking point to place the blocks.

It's a good thing I don't do this for a living. It took me all day just to build a crummy door!

My father-in-law gave me three old windows. Two small ones and a big one ("big" being 36" square). I decided to put the small ones on the side walls, and the big one in the door. Why the door? I wanted the big window on that end since it faces the house. But I didn't want to take up more wall space than the door was already taking up.

I framed out the door then held it in place with wedges. I concentrated the wedges to hold up the side opposite the hinge knowing it would sag a little. With it held firmly in place, I put on three heavy duty hinges and set the window. I tested the swing and it was nice and smooth and had no tendency to swing itself open or closed when I let go.

I wedged it back in place and cut the tin and screwed it on. There wasn't much sagging at all when I removed the wedges and the door was still as smooth as could be.







That used tin with all the holes and discoloration and rust spots makes it look like a 100 year old hillbilly shack, but for the price I can't complain!

I'm not nearly as far along as I had hoped to be at this point. I had 2 weeks off from work and had hoped to be all done and moved in by now. As it is, I still need to run electrical, install lighting, build shelves, finish sealing gaps, and a ton more. I have to go back on work tomorrow, so progress will be slow for a while. But I'm well on my way and very happy to have what I have.

Building My Workshop Part 5

Originally posted on Shopsmith Forums on 1/1/2012

I'm a bit late on the progress updates. I was lucky enough to get my dad's help 3 days in a row this week. The first day, as previously mentioned, we got the walls framed and rafters ready to be nailed down.

The second day it seemed like we didn't make as much progress. We got the rafters nailed down, the "bird boards" cut and nailed in, and the tin on the roof.



Then next day we got the rest of the tin siding on, ran electrical feed wire from the pole/meter/breaker box to the workshop (but not tied in at either end yet). Dad's help and guidance was invaluable!





The next day (Friday) I had to go into town and by the time I got back into only had enough time to put some silicone in all the holes in the old tin on the roof.

Saturday we had to run into town again that morning and had a New Years party to go to that evening (an early family friendly one). Between that, I put silicone in the holes in the walls, put a few more screws in the tin, and used up the 4 cans of Great Stuff I had filling gaps (think I need about 10 more cans!).

Building My Workshop Part 4

Originally posted on Shopsmith Forums on 12/27/2011


The rain broke and my dad came out today and we made some great progress. Got all the walls framed and all the ceiling joists cut. He's coming back tomorrow and we should finish getting the rafters nailed down and all the tin on. Then I'll just have electricity, shelves, unpacking the storage, etc.

Building My Workshop Part 3

 Originally posted on Shopsmith Forums on 12/23/2011

 Got the floor done today. The Shopsmith legs/tubes will become a miter gauge/planer stand. I couldn't help going ahead and setting it on there to start getting a feel for potential layouts.



More rain on the way, so I covered it with a tarp and I'm done until after Christmas.